Skip to content
Case studiesLogistics & Mobility

Aligning a 24-Person Team Across Functions

A 24-member global team was brought into line across design, sourcing, quality, logistics and fulfilment, with collaboration gains the team could measure.

Why does a fully staffed global team still miss handoffs?

Because each function is optimising on its own. Design decides without sourcing, sourcing commits without logistics, and quality problems surface late because the loop back to design is informal. Shared decision points, one review where the functions meet, and named owners at each handoff removed the rework.

Work done by a MetMov partner in an operating role, inside the company, before MetMov. Not a client engagement. The employer is not named.

RoleOngoing since 2023

Key results

01
Removed 20% of the duplicate work across functions
02
One source of truth for decisions that cross functions. Design, sourcing, quality and logistics now read the same data.
03
Process cycle times shortened by removing the email and spreadsheet layer between functions
04
A 24-member team aligned across design, sourcing, quality, logistics and fulfilment. Joint decisions now come out of fixed weekly and monthly reviews.
The challenge

THE STRUCTURAL DISEASE

The company ran a global supply chain covering sourcing, manufacturing, compliance, logistics and fulfilment across several geographies, with a 24-member team managing those functions. On the surface every function was staffed and running: orders moved, products shipped and the business looked operational.

Underneath, the organisation had Cross-Functional Misalignment. Design made decisions without sourcing input, and sourcing made commitments without seeing logistics. Quality issues surfaced late, because the feedback loop between manufacturing and design was informal and slow. Each function optimised for itself, and that created friction and rework at every handoff.

When every function in a global team runs on its own, the team works like a set of silos joined by email threads and escalations.

The second condition was a Meeting Architecture Deficit. The team had no set operating rhythm that made the functions see each other's work. Reviews happened inside each function and decisions were made in one-to-one conversations, so no single forum brought design, sourcing, quality, logistics and fulfilment leaders together to face shared constraints and make joint trade-offs.

THE ROOT CAUSE

Every function had capable leaders, so this wasn't a people problem. The cause was in the structure: the organisation had grown by adding functional heads without building anything to connect them.

  • Disease 1: Cross-Functional Misalignment. Each function had its own priorities, timelines and success measures. Design optimised for looks and innovation, sourcing for cost, quality for compliance and logistics for speed, and nothing existed to bring the trade-offs between those goals into the open or settle them in a structured way.
  • Disease 2: Meeting Architecture Deficit. With no regular schedule of cross-functional reviews, alignment happened by chance. Critical decisions such as vendor selection, timeline changes and quality trade-offs were made inside one function and shared afterwards. By the time the functions further down the chain heard about a decision made further up, the rework was already locked in.
The solution

THE INTERVENTION

The work was a structural redesign of how 24 people across several functions and geographies made decisions together, which is a different thing from a team-building exercise. It came in four layers:

  • Layer 1: Cross-Functional Workflow Automation. The handoffs between design, sourcing, quality and logistics were automated. That cut manual steps and shortened process cycle times, because the layer of emails and spreadsheets that delayed information between functions went away.
  • Layer 2: Operating Cadence Installation. A structured set of cross-functional reviews was set up at weekly and monthly intervals. Each review had a fixed agenda and required attendees from every affected function, and it produced written decisions with clear owners and deadlines.
  • Layer 3: Shared Visibility Layer. Operational dashboards gave leadership a view of KPIs, vendor performance and cost impact across all functions. For the first time design could see sourcing lead times, sourcing could see quality rejection rates and logistics could see production schedules, so shared data replaced guesswork.
  • Layer 4: ERP Integration. The Odoo ERP was upgraded, and its sourcing, inventory, order management and finance modules were connected. That removed 20% of the duplicate work across functions and gave the team one source of truth for decisions that cross functions.

MEASURED OUTCOMES

IF THIS SOUNDS FAMILIAR

This pattern is common in organisations with distributed teams:

  • Your functional heads are strong, and work that crosses functions is still slow and full of rework. Each leader runs a domain well on its own, and the problems sit in the handoffs: where design meets sourcing, where sourcing meets quality and where quality meets logistics.
  • Your team talks constantly and rarely aligns. Slack messages, email chains and quick calls look like collaboration, but decisions still get made in silos and shared afterwards, so the functions further down the chain keep reacting to surprises from further up.
  • Your ERP holds data that nobody trusts enough to decide on. Duplicate entries, manual workarounds and modules that don't talk to each other mean everyone keeps a personal spreadsheet, and the system of record creates more confusion than it settles.
  • You've tried "improving communication" without changing the operating structure. Communication workshops, alignment meetings and collaboration tools treat the symptoms. Until decisions flow differently between functions, more communication just escalates the same problems faster.

START WITH A DIAGNOSIS

Cross-functional misalignment and a meeting architecture deficit are among the most common structural diseases in organisations with distributed teams. They're also among the most expensive, because the cost shows up as rework, delays and missed opportunities instead of as a line item anyone can point to.

MetMov's Operating Spine Install (Offer 2) builds what connects the functions: shared operating rhythms, automated handoffs, connected data and clear accountability across functions. It leaves the functional leaders in place and gives them the structure they need to work together.

Book a Fit Call: metmov.com

Discussion

Discussion

Leave a comment

Next

Ready for a similar transformation?

Install your Operating Spine in 90 days. Start with a short scoping call.

Chat with us!

Pick a time that suits you.